Electrical Mastery Series
Eight Episodes built in order. Every number you calculate feeds the next decision. Don’t skip ahead — the sequence is the system.
BY EPISODE 8 YOU’LL KNOW SIX THINGS MOST CRUISERS NEVER FIGURE OUT!
Eight episodes. Every formula. Every safety standard. From your first load calculation to a fully specified system ready to install — without needing an electrician’s background.
Eight Episodes built in order. Every number you calculate feeds the next decision. Don’t skip ahead — the sequence is the system.
BY EPISODE 8 YOU’LL KNOW SIX THINGS MOST CRUISERS NEVER FIGURE OUT!
Build a real Load Sheet with honest duty cycles — not guesses. The number every decision flows from.
Apply the 1.5× buffer and 2-Day Rule to get usable capacity, then convert to nominal for your chemistry.
Solar, alternator, shore power and generator — all matched to the same chemistry profile, no conflicting sources.
Know why the fuse doesn’t protect you — and what does. The physics of corrosion, heat, and wire fires.
AWG sizing for 3% voltage drop, the 7-inch fuse rule, tinned copper, gas-tight crimps. Every non-negotiable.
The thermal killer explained. DC-DC charger vs external regulator — pick the right strategy for your boat.
All 8 episodes, all study materials, and all downloads are 100% free forever.
We earn revenue from affiliate product links from this site — not from putting knowledge behind a paywall.
Understanding DC power, Ohm’s Law as a safety issue, and why the voltage decision shapes everything from wire size to system cost.
Study Guide | Cheat Sheet | Checklist |
New to marine electrics? Grab this one-page reference card first. Every term used in Episode 01 — volts, amps, amp-hours, Ohm’s Law, I²R — in plain English. Keep it open while you listen.
Build your Load Sheet, calculate your TDAHC, and size your system correctly — before spending a dollar on equipment. This step alone saves most cruisers $2,000+.
Study Guide | Cheat Sheet | Checklist | Course Worksheet | => Design your System with Sparky
Print this before the next step. List every load aboard, estimate hours/day, apply the 1.5× losses buffer, and get your TDAHC in 10 minutes. Your number feeds directly into Sparky.
A no-hype comparison of AGM, Gel, and LiFePO₄ for offshore cruising — with real cost math over 5 years. Move past sticker shock.
You think AGM is cheaper. Most liveaboards reach lithium break-even within 3 years. This one-page calculator shows total cost of ownership at Year 1, 3, and 5 for your specific bank size — with real replacement cycle math included.
How to safely charge from all four sources without damaging your bank or your alternator. Multi-source prioritization for offshore passages.
Study Guide | Cheat Sheet | Checklist | => Design your System with Sparky
Cruising in the Caribbean, Pacific, or Indian Ocean? Your electrical system was probably designed for a Northern European marina. This checklist covers the 6 adjustments tropical sailors must make — including the 1.17× wire derating factor and the refrigeration duty cycle reality check.
The wiring standards that separate a safe boat from a floating fire hazard. Every non-negotiable rule from ABYC E-11.
Study Guide | Cheat Sheet | Checklist | => Design your System with Sparky
A self-guided visual audit with a Red / Amber / Green risk framework. Five warning signs of dangerous connections, the 7-inch fuse rule compliance check, wire type identification, and a voltage drop spot-check method. Found a Red issue? Don’t leave the dock.
Why a B2B charger is mandatory in any LiFePO₄ retrofit — and how to wire two banks that never interfere with each other.
Study Guide | Cheat Sheet | Checklist | => Design your System with Sparky
Five non-negotiable checks before your first engine run with a lithium bank: DC-DC charger fitted, BMS installed and tested, every charge source reconfigured, ANL/MRBF fuse within 7 inches of positive terminal, shunt monitor installed. Each maps directly to what you just learned.
The most expensive preventable failure on cruising boats. The only safe solutions — external regulation or DC-DC isolation — are explained with real failure scenarios.
Study Guide | Cheat Sheet | Checklist | => Design your System with Sparky
Five non-negotiable checks before your first engine run with a lithium bank: DC-DC charger fitted, BMS installed and tested, every charge source reconfigured, ANL/MRBF fuse within 7 inches of positive terminal, shunt monitor installed. Each maps directly to what you just learned.
Putting it all together with a complete walkthrough using Sparky (MarineAmp). The correct sequence from load calculation to a purchase-ready spec sheet.
Study Guide | Cheat Sheet | Checklist | => Design your System with Sparky
The exact template Sparky fills out as you work through the series. Covers all six design steps: TDAHC, bank size, charging sources, protection strategy, wire sizing, and smart devices. Your completed spec sheet is what Captain Yossi reviews — and what you hand to an installer.
Features
Educational Disclaimer: All course content, study materials, and tools provided by Sea-U Media LLC are for educational and informational purposes only. Marine electrical systems involve serious safety risks, including fire, electrocution, and vessel loss. Always consult a qualified ABYC-certified marine electrician before undertaking any electrical work aboard your vessel. Sea-U Media LLC assumes no liability for errors, omissions, or outcomes resulting from use of this content.